Published On Apr 10, 2017
A 260 tons heavy transformer was unloaded off a pontoon at the Ems river in Leer, Germany on April 6, 2017. In the following days, it was transported to the distribution station. A self propelled modular transport systems consisting of 12 axes was used to transport the transformer to the other side of the dike.
This is part 1 of a threepart series about the transformer transport from Leer to Conneforde:
◾️ Part 1: Unloading the transformer off the pontoon
◾️ Part 2: Departure of the 592 tons heavy Transformer Bridge (under progress)
◾️ Part 3: Conversion of the Transformer Bridge (under progress)