Heavy Transport - 600 Tons get stuck | High Girder Bridge
HD1080ide HD1080ide
1.67M subscribers
3,916,844 views
0

 Published On Apr 15, 2017

A 95 meters long and overall 592 tons heavy formation transported a 260 tons heavy transformer from Leer to a distribution station near Conneforde, Germany. For this, the High Girder Bridge of the Kahl Heavy Haulage corporation was applied. The transformer came by a barge on the Ems river (   • Anlanden eines 260-Tonnen-Trafos in L...  ).

This is part 2 of a threepart series about the transformer transport from Leer to Conneforde:

◾️ Part 1: Unloading the transformer off the barge:    • Anlanden eines 260-Tonnen-Trafos in L...  
◾️ Part 2: Departure of the 592 tons heavy Transformer Bridge
◾️ Part 3: Conversion of the Transformer Bridge:    • Schwertransport: Umbau der 600 t Seit...  


Subscribe:    / @hd1080ide  
Facebook:   / hd1080ide  
Twitter: www.twitter.com/HD1080ide

show more

Share/Embed