MK Project 【Japanese civil engineering】
33.9K subscribers
10:14
Using a crane to operate heavy machinery and remove 1,500 tons of sediment from the river.
MK Project 【Japanese civil engineering】
90K views • 9 days ago
12:11
The process of attaching an attachment that dramatically extends the reach of the power shovel.
MK Project 【Japanese civil engineering】
68K views • 3 weeks ago
10:18
To repair a canal, 80kg of concrete will be transported over 20km.
MK Project 【Japanese civil engineering】
28K views • 1 month ago
20:25
Complete reconstruction of disaster areas with Japanese engineering.Disaster Recovery - Full Edition
MK Project 【Japanese civil engineering】
67K views • 1 month ago
15:25
Quick dam-like structures to block rivers in disaster areas. 【Disaster Recovery - Part.8】
MK Project 【Japanese civil engineering】
111K views • 2 months ago
14:46
3 Japanese engineers set 400 1-ton blocks, bringing hope to disaster areas【Project Part.7】
MK Project 【Japanese civil engineering】
347K views • 2 months ago
52:16
Recovery Process from Road Collapse Due to Rain【Disaster Recovery Project Part 1-6 Compilation】
MK Project 【Japanese civil engineering】
509K views • 3 months ago
14:26
Revived disaster areas, Japan's civil engineering. [Recovery Project - Part 6]
MK Project 【Japanese civil engineering】
54K views • 3 months ago
16:36
Japanese civil engineering for disaster recovery: Concrete, scaffolding, formwork. [Project Part 5]
MK Project 【Japanese civil engineering】
100K views • 3 months ago
58:42
Six Astounding Civil Engineering Processes Supported by Skilled Artisans in Japan
MK Project 【Japanese civil engineering】
713K views • 4 months ago
12:55
Artisans Revive Disaster Zone: Large Blocks Set, Drains Removed.[Disaster Recovery - Part 4]
MK Project 【Japanese civil engineering】
40K views • 4 months ago
11:52
Rebuilding after disaster: Precision in placing giant blocks.[Disaster Recovery - Part 3]
MK Project 【Japanese civil engineering】
173K views • 4 months ago
17:16
Progress in Disaster Recovery: From Near Collapse to Hope [Disaster Recovery - Part2 ]
MK Project 【Japanese civil engineering】
47K views • 4 months ago
15:30
Starting the months-long major recovery project. [Disaster Recovery - Part 1]
MK Project 【Japanese civil engineering】
50K views • 5 months ago
11:42
Restoring a landslide-prone mountain slope using 2000-year-old stone stacking techniques.
MK Project 【Japanese civil engineering】
323K views • 5 months ago
10:05
Ring Method Revamp: From Steep Slope to Car-Friendly Ramp
MK Project 【Japanese civil engineering】
150K views • 5 months ago
10:15
"The Process of Restoring a Hazardous Exposed Retaining Wall and Soil-Sand Boundary
MK Project 【Japanese civil engineering】
48K views • 5 months ago
16:20
The preparatory steps to make a steep slope gradual. Excavate the concrete and bury drainage pipes.
MK Project 【Japanese civil engineering】
315K views • 6 months ago
6:17
10 years of grime, one magical high-pressure clean: Watch the wall's enchanting revival!
MK Project 【Japanese civil engineering】
7.1K views • 6 months ago
17:01
"Transformation from Overgrown Wasteland to Parking Lot: Paving and Clearing Process"
MK Project 【Japanese civil engineering】
54K views • 6 months ago
13:27
Restoration work on the seawall that collapsed in the disaster.
MK Project 【Japanese civil engineering】
28K views • 8 months ago
10:39
水が溢れ出る冠水現場。小さな側溝に覆いかぶさった5000キロの土砂を撤去します。【側溝掃除】
MK Project 【Japanese civil engineering】
502K views • 8 months ago
4:38
Putting 20 kg of concrete in the heat【Japanese craftsman】
MK Project 【Japanese civil engineering】
8.8K views • 8 months ago
21:03
Widen the narrow road 【Japanese craftsman】
MK Project 【Japanese civil engineering】
285K views • 8 months ago
9:08
Install rain gutters 【Japanese craftsman】
MK Project 【Japanese civil engineering】
38K views • 9 months ago
9:13
記録的激しい雷雨で工事が中止に、、、これが土木工事のリアル -路体盛土編- 【道路拡幅工事-Part.4】
MK Project 【Japanese civil engineering】
42K views • 9 months ago
10:06
降りしきる雨の中、巨大L型擁壁を設置する。-L型擁壁設置編-【道路拡幅工事-Part.3】
MK Project 【Japanese civil engineering】
73K views • 10 months ago
11:32
杭を100本打ち込んで強固な型枠を組みコンクリートを打設する。-基礎コンクリート編-【道路拡幅工事-Part2 】
MK Project 【Japanese civil engineering】
50K views • 10 months ago
8:11
4トントラック100台分の床掘後に大量の基礎砕石を敷き均す -床掘編-【道路拡幅工事 - Part 1】
MK Project 【Japanese civil engineering】
38K views • 10 months ago
9:06
Three lean and sophisticated craftsmen finish the concrete in just 4 hours
MK Project 【Japanese civil engineering】
159K views • 10 months ago
Load More