Published On Jun 19, 2022
In our previous vlog here at PNR Clark Phase 2, we went to the stations in Angeles and Clark.
In this video, let's go to the last segment of the Project, the Contract Package N-04. It is 7.8 kms of railway track starting from Clark to Clark international airport station which will be an underground station including 1.3 of the access track for the depot.
On the 7.8-kilometer railway track for Contract N-04
2.4km of these are the viaducts: this includes the 210-meter box girder bridge that will intersect at SCTEX NLEX Link ramp and the 350-meter steel girder bridge for SCTEX. 2.3 KM at grade level and a 3.1-km underground railway track right to Clark International Airport and the depot
This project was awarded to the Acciona-EEI joint venture
From Malolos Bulacan, come and join me again on my visit to Clark.
#MCRP #PNRClarkPhase2 #clarkinternationalairport
Reference:
Feasibility Study On The Malolos - Clark Railway Project
https://www.jica.go.jp/english/our_wo...
Drawings from DOTr:
https://drive.google.com/drive/u/0/fo...
Trip Schedule:
/ 5375643035791844
Credits:
Music from Uppbeat (free for Creators!):
https://uppbeat.io/t/soundroll/bring-...
License code: UVU3JCPYXKTOOCWJ
Music from Uppbeat (free for Creators!):
https://uppbeat.io/t/mojo/rebel
License code: X4JGP5LCUU7ZEF3O