Published On Feb 15, 2024
Six liner shafts have been installed in the Bristol Channel– ready for final connection to the tunnels, which will provide cooling water to the nuclear power station.
show more
To download video: Right click on the following button and select "Save Link As"
To download mp3 (audio): Click "Download mp3" button
Download mp3Copyright © 2024, All Rights Reserved!