Construction of a Pipe Trench
DignitasTechnologies DignitasTechnologies
200 subscribers
340 views
0

 Published On Oct 15, 2013

© 2024 Dignitas Technologies, LLC. All Rights Reserved. Product developed and owned by Dignitas Technologies, LLC.

This video demonstrates advanced dynamic terrain technology. The focus is interactive construction of a trench and burying of a steel pipe using both the excavator and bulldozer.

The following capabilities are demonstrated:
- Physics based models and soil resistance
- Bulldozer, HMMVW, and M1A2 models from SE Core CM2
- Integrated with OneSAF
- Resistance illustrated by lifting of excavator, engine sound, and depth of bucket
- Soil saturation and rain accumulation in modified terrain shown occurring over time

The SE Core Afghanistan East terrain database was used for this presentation.

show more

Share/Embed