Published On Apr 9, 2021
The last trip of the Transrapid 09 began on September 13, 2017: The maglev train was loaded onto three low-loaders on the former test track in Lathen and then transported to Nortrup. There the high-speed train was set up on the premises of the Kemper meat factory on a specially constructed 75 meters long concrete route.
The descendants of the Transrapid inventor Hermann Kemper bought the maglev train for € 200,001.
▬ Suggested Videos ▬▬▬▬▬▬▬▬▬▬▬▬
👉 Salvage of a 102 tons Glacial Erratic Rock: • Salvage of a 102 tons Glacial Erratic...
👉 The Amphibious Vehicles of Brittany: • Boats on Wheels: The Amphibious Vehic...
▬ More Videos ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
►Subscribe to my Channel: https://www.youtube.com/user/HD1080id...
▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
►Facebook: / hd1080ide
►Twitter: www.twitter.com/HD1080ide