Published On Jan 16, 2021
In early July 2020, several wind turbine blades were transported through the small town of Balve, Germany. Because of the partly steep and winding route, an 18-axle special vehicle was used that could lift the 41-meter-long rotor blades in the winding sections.
▬ Suggested Videos ▬▬▬▬▬▬▬▬▬▬▬▬
👉 Heavy Haulage of Giant Tank Gone Wrong!: • Heavy Haulage of Giant Tank Gone Wrong!
👉 Salvage of a 102 tons Glacial Erratic Rock: • Salvage of a 102 tons Glacial Erratic...
▬ More Videos ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
►Subscribe to my Channel: https://www.youtube.com/user/HD1080id...
▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
►Facebook: / hd1080ide
►Twitter: www.twitter.com/HD1080ide