Anchored Soldier Pile and Lagging Shoring System completed by Doublestar Drilling
Doublestar Drilling Doublestar Drilling
41K subscribers
25,096 views
0

 Published On Aug 17, 2018

A Doublestar Drilling Anchored Soldier Pile and Lagging Shoring System at the Augustana Site in Edmonton, AB. Using our Soilmec SR65 to drill and install the H-Beams for the 68 Soldier Piles to depths of 23m. Our Soilmec SM14 tieback drill installed five rows of 176 anchors to lengths of 18m and the total excavation depth was 19m.

show more

Share/Embed