Final Jobs Before Camping - VW T5 Camper Project
Dan Chambers Dan Chambers
125K subscribers
20,214 views
0

 Published On Jun 18, 2023

Go and check out the new collection and grab some holiday clothes!
https://www.dacind.com

Now that the interior furniture is built we have a few small jobs to do to get the van useable. We ned to connect up all of the electrics to get them working including Solar panel, Solar charge controller, 240v hook up, 240v battery charger, DC-DC charger, USB charging points, 12-240v inverter and 240v sockets and the light which we have also installed dimmers on. We went to see Daz from Woodhouse & Carmen / Caps and Keys to get a new key cut and programmed to the van as the original key has been playing up. We got the hob working by installing a gas locker, drop out vent and Camping gaz 907 gas bottle. The next job was the mounts to hold the fresh and waste water bottles and connecting them up to the sink. We managed to fit 2 10L bottles in which should last us a few days washing hands and brushing teeth. I have also wired the stereo into 2 2-way switches. one switches the permanent live the other switches the ignition live meaning we can have the stereo working on the ignition key as normal or switch it over and the whole system runs off the leisure battery and solar panel. The last job was to install some Heko wind deflectors which I think are a camping essential.

Woodhouse & Carman / Caps n Keys
  / dub_nutz  
  / capsnkeys  

Transporter HQ
https://transporterhq.co.uk/vw-transp...

Link to my other YouTube Channel with my wife @danandabi:
   / danabi  

Want to support the channel?

DAC Industries Hoodies, T-Shirts, Wooly Hats, Snapbacks & Stickers are available to buy from my website:
https://www.dacind.com

My Instagram Account:
@dan.a.chambers

show more

Share/Embed