Electrify America's 350kW Site Upgrades (with Balanced DC Fast Charging)
Plug and Play EV Plug and Play EV
5.65K subscribers
9,760 views
0

 Published On Oct 29, 2022

On this follow-up trip to Electrify America's first charging station in Chicopee, Massachusetts, we assess the effectiveness of EA's upgraded 350kW hardware.

Throughout a varied visit, we share stalls with another Hyundai IONIQ 5 and a couple of Ford F150 Lightnings, while pondering peak charge rates, cable practicality, and Electrify America's new balanced DC fast charging.

But did we get a successful session on every charger? Watch the full video to find out!

You can also take a look at our September trip to the site, before it was all buttoned up:    • Upgrading Electrify America's Oldest ...  .

Or catch our visit to the initial site that was upgraded over the summer, down in Valley Stream, New York:    • Testing Electrify America's Newest DC...  

Thanks for watching and keep your eyes peeled for a wider update on Electrify America before 2022 is out, including current station count and how these 350kW site upgrades are progressing across the country.
----------------------------------------------------------------------------------------------------------------
Questions/comments/suggestions welcome via [email protected] or over on Instagram/Twitter @plugandplayEV.
----------------------------------------------------------------------------------------------------------------
Fuel the channel by shouting us a cup of joe on Ko-Fi: https://ko-fi.com/plugandplayev
----------------------------------------------------------------------------------------------------------------

show more

Share/Embed