Published On Jan 11, 2020
Getting everything ready to start working on the roof, putting the support logs in place under the end of the balcony and the log I pulled on top of the log house 1 month ago. Now everything is done, next step is the roof.
Thanks for watching!
Log Cabin Building Second Year Recap:
http://bit.ly/LogCabin2020Recap
Off Grid Log Cabin Playlist:
Season 1: http://bit.ly/offgridlogcabin
Subscribe to my channel to not miss the future episodes: http://bit.ly/rijavecniksubscribe
Music:
auv - McCarren https://chll.to/b2a285ce
Dontcry, Sebastian Kamae - polaroid https://chll.to/e908d3db