The Lock-Up stage has the following construction steps as shown in the video -

00:11 Introduction
00:18 Main Door Fixed
00:29 Window Frames Fixed
00:43 Raft Fall Guard
00:49 Fascias and Gutter Installed
00:53 Multiple Activities at Site
01:13 Roof Insulation for Colourbond Roof
01:20 Ducting for Heating and Cooling
01:32 External Wall Wrap for Insulation
01:41 Brick Laying Preparation
01:43 Veneer Ties
01:53 Veneer Ties attached to Frame
02:01 Shower Base and Bath Hob Constructed
02:04 Plumbing Rough-In's
02:07 Electrical Rough-In's
02:15 External Electrical and Plumbing Rough-In's
02:24 External Bricklaying Completed
02:28 External Wall and Ceiling Insulation
02:34 Like and Subscribe